Corporation’s renovated Swimming Pool ready to make a Splash

The city corporation’s renovated indoor swimming pool housed in Gandhi Park will be opened for public from Saturday. While employees of the corporation, their family members and corporation school students can use the pool for free, members of the public have to pay a fee to use the facility. Swimming pool manufacturer in kerala
“We have fixed Rs 50 for an adult per hour and Rs 25 for a child,” an official said.

In May 2012, a seven-year-old boy had drowned in the pool, which was 12 feet deep. The corporation then decided to renovate the pool and spent Rs 1.87 crore on the work.

According to sources, the depth of the renovated pool has been reduced drastically. “It is 4-5 feet deep, 12.6-metre wide and 25.6-metre long. A separate two feet deep pool has been constructed for kids. Toilet facilities also have been arranged in the premises,” the official said.

 The pool will be maintained by a Chennai-based firm for three years. “Experienced coaches will be there to guide people. Also, the firm will conduct swimming classes for women handled by women coaches,” he said.
 “The new pool will help corporation school students to train and participate in swimming competitions. The gallery can accommodate more than 100 people. Water for the pool will be fetched from the bore well located inside the Gandhi Park,” he added. Swimming pool manufacturer in kerala
 Municipal administration minister SP Velumani will inaugurate the facility. Swimming pool manufacturer in kerala
According to sources, the depth of the renovated pool has been reduced drastically. “It is 4-5 feet deep, 12.6-metre wide and 25.6-metre long. A separate two feet deep pool has been constructed for kids. Toilet facilities also have been arranged in the premises,” the official said.

Share this post

Leave a Reply

Your email address will not be published. Required fields are marked *